BOX CULVERT / BRIDGE SPANS

Home / Projects / Box Culvert/Bridge Spans / KDOT Quivira Ramp and 435

KDOT Quivira Ramp and 435

Arch Tunnel for 435 east bound from Quivira (over the tunnel) and for HW 69 south bound from east bound 435 (thru the tunnel) The Arch Tunnel consisted of 28 strait and 58 curved sections for a total of 86. These sections are 4′-0″ long and have a 48′-0″ span and 11′-0″ Rise and sit on a field cast stem wall. These sections were built at PRETECH’s Kansas City Kansas facility and shipped the 10 miles to the job site where Clarkson erected the Arch Tunnel.

Project Details

Job Name:

KDOT Quivira Ramp and 435

Location:

435 & Quivira, Overland Park Kansas, Johnson County

Owner:

Equipment:

Start Date:

Spring 2012

End Date:

Summer 2012

Pretech PT #:

SPT 1101

Contractor:

Clarkson Construction

General:

Project Manager:

Rich Markey

Engineering Firm:

Bill Bundschuh

President/Owner

[email protected]

 913-927-1680

Request a Material Quote

This field is for validation purposes and should be left unchanged.